Council approval

Any pool holding more than 300mm of water needs approval and a safety barrier. Pick your state and we'll lay it out.

In WA there are three steps.

  1. Get a building permit from your council. About $172, up to 25 business days.
  2. Put up a safety barrier before you fill the pool.
  3. Lodge a one-page completion form. Council inspects, you're done.

The detail is below if you want it. If you'd rather not touch any of it, there's someone who will.

1. Get a building permit

One application to your council, online. The main thing they want is a drawing of where the pool and fence will sit on your block.

Show me exactly what to lodge
  • Form BA2 (building permit, uncertified). Same form statewide; download the PDF, or fill it in on your council's online portal.
  • The drawings: a site plan at 1:200 showing the pool, barrier and pump with distances to the boundaries, plus a barrier elevation showing fence height, footings and gate hinge and latch heights. Any local draftsperson who knows pools does both, or Aus Pool Permits does it for $450. If you're using a fencing company, they'll usually supply the barrier elevation themselves.
  • Our engineer's structural certificate and drawings for your pool size, free. Email hello@terratanks.com.au with your pool size and we'll send them.
  • The fee: about $172, paid to your council when you lodge. That's their $110 permit fee plus a $61.65 state levy they collect on the government's behalf. Some councils also take the inspection fee here.

Councils have up to 25 business days. You don't normally need planning approval too, unless the block is heritage-listed or the pool sits close to a boundary.

2. Put up the safety barrier

Before the water goes in. In WA the barrier has to meet AS 1926.1-2012, which in practice means a 1.2m fence with a self-closing gate and nothing climbable next to it.

Show me the barrier rules
  • At least 1200mm high, measured from the outside.
  • No gap over 100mm under it or between bars.
  • A 900mm non-climbable zone on the outside: no pots, pumps, furniture or rails.
  • A self-closing, self-latching gate that opens away from the pool, latch at least 1500mm up. Gates are what fail inspections.
  • Boundary fences can form part of it if they're at least 1800mm on the pool side.

Full detail in the WA Government's Rules for Pools and Spas.

3. Lodge the completion form and get inspected

Send your council Form BA7 (download the PDF) within 7 days of finishing. Same form statewide; some councils have it as an online form. They inspect the barrier within 30 days, then every four years after that (usually a small charge on your rates).


Choosing a fence

Most people need less fence than they think. Put the pool in a corner and your boundary fences count as two sides, so you're adding two short sides and a gate, around 8 to 10 metres.

Do it yourself

Aluminium panel kits from Bunnings or a fencing supplier. Roughly $1,000 to $3,000 for a corner pool. Pick one marked AS 1926.1 compliant.

Hire a local fencer

Search "pool fencing" plus your suburb. Aluminium is about $105 to $370 a metre installed, glass $315 to $840. Ask them to build to AS 1926.1-2012 and supply the elevation drawing for your permit.


Prefer to have an expert handle it all for you?

Our preferred installers do the lot: permit, base, pool, fence, decking, inspection. One quote, one crew. They quote you directly.

Tucker Build & Shade, Perth. Call Gabby on 0458 494 349
JLS Group WA, Perth. Call Jock on 0430 752 183


About your base (every state)

Our engineer has certified five ways to sit the pool: a concrete slab, pavers, a compacted gravel and sand pad, in-ground, or on a raised deck. On stable soil (class A, S or M) any of them works. On reactive clay (class H1 or H2) it must be a 150mm reinforced concrete slab or a raised deck. If your soil is class P or E, the base needs a site-specific engineer. Your draftsperson or certifier can tell you your soil class.


Stuck on anything? Call George on 0424 661 542.

Rules are set by each state and applied by your council or certifier, and they change. Fees quoted are the published minimums as at October 2026. Confirm with your council or certifier before you order, dig or fill.